Traditional Leadwork Craft Modules 1 & 2
Lead Modules 1 & 2
This course is the natural progression for those who have completed the Basic Leadwork Craft course and want to gain a further recognised qualification in leadwork. It has been developed for those who want to acquire the skills for working with lead sheet and the knowledge of the design, repair and maintenance of leadwork used in roofing, cladding and weathering applications.
Module 1 – Flashing details Inc Assessment
· Soakers & step flashings
· Front apron (bossed)
· Single step flashing
· Clips to free edges
· Step & cover flashings to tiles
· Back gutter (bossed)
· Apron flashing to profiled tiles
· Butt weld
· Lap weld
· Cover patch
· Gusset corner/inclined welding
· Front apron (welded)
· Apron flashing (internal corner)
· Saddle
· Apron Flashing to patent glazing
· Lead slate
· Chimney flashings to stack
· Chimney DPC
· Pitched valley gutter
· Ridge roll with clips
Module 2 - Weatherings Inc Assessment
· Welted parapet capping
· Cornice with welt and leadwelded break corner
· Cornice with wood roll and pipe penetration
· Chute outlet (welded)
· Catch pit (welded)
· Gutter drips (bossed)
· Gutter drips (welded)